L&T Construction wins Order for Railway Business Group to construct - Jakarta Mass Rapid Transit Project (Phase 2A)

The Jakarta MRT Phase 2A is an extension of the existing Jakarta MRT Line for the section between Bundaran HI up to and including Kota with a total length of approx. 12.5 km and 7 underground stations.

L&T Construction Wins Order for Buildings & Factories Business

From a reputed real-estate developer to construct Multi storeyed residential towers at Thane in the Mumbai, metropolitan Region. The scope of the order includes construction of the core and shell works for five towers having 62 floors and allied parking area comprising basements+ground+5 podiums.

L&T Construction secures order for its Transportation Infrastructure Business (TI)

To construct the Palashbari to Sualkuchi Cable-Stayed Bridge across the river Brahmaputra in Assam. The project has been awarded by the Public Works Roads Department (PwRD), Assam to construct a 12.21 km bridge with approaches connecting Palashbari and Sualkuchi. The bridge will directly connect both the towns.

L&T Wins Orders for Hydrocarbon Business

From a prestigious client in the Middle East. The scope of work for the onshore order comprises engineering, procurement, & construction of an Enclosed Ground-Flare system and demolition of existing facilities, reducing flame and smoke visibility to the nearby ongoing large scale residential developments.

L&T Heavy Engineering Wins Multiple Orders

From a key oil and gas customer in KSA for their important debottlenecking project. For the last couple of years, MRU business has concentrated on Middle East opportunities and this order is an important milestone for MRU business in the Middle East.

L&T Wins Order for its Power Business

From West Bengal Power Development Corporation Limited to set up wet Flue Gas Desulphurization (FGD) systems for its Thermal Power Plant at Sagardighi in the state of West Bengal. The project’s unique features include three FGD absorbers catering to four thermal power units (2x300 MW, 2x500 MW) while balance of plant systems to be installed shall cater to five units of the plant.

Mumbai Coastal Road Project (MCRP)

Involves the construction of a 7.75 Km Coastal Road from Princess Street Flyover to Baroda Palace including an underground tunnel passing below Girgaum Chowpatty, Malabar Hills and Priyadarshini Park.

High-Speed Rail Corridor

Our Heavy Civil Infrastructure (HCI) and Transportation Infrastructure (TI) are executing certain Mumbai-Ahmedabad High-Speed Rail (MAHSR). As part of the C4 package, HCI will be constructing a 237.1 km stretch involving viaducts, stations, major river bridges, depots, and other auxiliary works.

Dhubri - Phulbari Bridge

Our Heavy Civil Infrastructure business is building India’s longest river bridge connecting Dhubri in Assam to Phulbari in Meghalaya over the river Brahmaputra that will reduce the distance between the two States by 250 km and improve the connectivity of the North Eastern States with the rest of the country.

Water Enhancement project of Ad Dhakhiliya Water Transmission System, Phase – II

Designing and executing a water enhancement project of Ad Dhakhiliya Water Transmission System, Phase – II in Oman. The scope includes laying 173 Km of water transmission pipeline with associated civil works, 18 RCC water storage reservoirs, 5 pumping stations with associated mechanical, electrical, control & instrumentation works.

Be a part of some of the world’s largest, most complex projects. Partner with us.

Already registered?   Sign In

Please fill the form below.

LSP Type (Select all that apply)